Description 
    Franki Construct has built a new laboratory in the port of Antwerp on the BASF site, which is the largest chemical production centre in Belgium.
The building measures 61 m x 35 m and is 16 m high. The ground floor and first floor are made from concrete. Columns, beams, arches and concrete façade panels are used on the ground floor. The “technical floor” is a steel construction, and the first and second floors have metal cladding. The laboratory is equipped with a green roof.
location 
    Project Details
                        Contractor                    
                    
                Scheldelaan 600, Antwerpen, Antwerpen, Belgium
                     
                    Client 
    BASF Antwerpen
      Special features
                    
                  Construction period
1 year 5 months
Start work
01-2019
End of work
06-2020
 
                    







 
                                       