Central Radiochemical Facility - Mol
 

Project Details


Activities
Civil Engineering
Heavy industry

Contractors
Willemen Bouw

location
Boerentang 200
2400 Mol
Belgium
Antwerpen BE

Client
SCK CEN Stichting Openbaar Nut

Architects
Arteum Architects

Engineering Office
Sweco Belgium (stabiliteit)

Construction period 
10 months

Start work 
03-2023

End of work 
01-2024


 

At the SCK site in Mol, Franki Construct is building a new production facility for medical radioisotopes. The CRF building will consist of two zones:

  • A controlled zone with a number of clean rooms for isotope production, areas for packaging the products and waste management, and radiological laboratory areas for checks and preparations.
  • A zone with office spaces, a meeting room, a chemical laboratory space for preparations and sanitary facilities.
Willemen Bouw

Boerenkrijgstraat 133
2800 Mechelen, Antwerpen (Belgium)
tel +32 3 450 77 00
bouw@willemen.be
www.willemen.be

Willemen Bouw was established on 30 April 2025 through the merger of Willemen Construct, Cosimco, Franki Construct and Tools.